Our role in the West Gate Tunnel project
We're helping the project understand its environmental impacts and obligations under the Environment Protection Act 2017(opens in a new window). We're working with the project across all phases, including environmental assessment, early works, construction and operation.
We advise the project on matters relating to:
- air pollution
- contaminated land
- contaminated and waste soil management
- greenhouse gas emissions and resource efficiency
- human health
- land use and planning
- noise and vibration
- surface water and groundwater.
The West Gate Tunnel project and the environment
The Minister for Planning decided that an environment effects statement (EES) was required for this project.
The EES assesses the potential environmental impacts of the proposed development. It provides an approach to manage these impacts. The EES is available from Victoria's Big Build(opens in a new window).
Impacts relating to pollution and waste identified in the EES are:
- noise and vibration
- odour, dust and vehicle emissions
- run-off from construction sites
- impacts on groundwater
- hazardous waste
- waste soil.
We made a submission to the EES process:
Development licence (formerly works approval)
In December 2017, we issued a works approval 155546 under the Environment Protection Act 1970 for the West Gate Tunnel project.
The works approval and its conditions are available on Permissions DL000155546 listed under More permission details and Documents.
Before mid-2021, we issued works approvals for the design, construction or modification of complex industrial or waste management facilities. A works approval provided us with the opportunity to influence the design of works prior to construction to ensure operating standards would be met.
For the project, a works approval was required for its ventilation systems.
The Environment Protection Act 1970 is no longer in effect. We no longer issue works approval. Instead, we issue development licences under the Environment Protection Act 2017.
Operating licence
We have issued an operating licence for the ventilation systems associated with the West Gate Tunnel Project. This infrastructure includes:
- 2 ventilation stacks
- jet fans
- air quality monitoring equipment designed to detect and report vehicle emissions.
Jet fans inside the tunnel direct vehicle emissions toward the ventilation stacks. The stacks contain several large exhaust fans. They are designed to safely disperse emissions into the atmosphere.
No emissions are released from the tunnel entry or exit portals. All emissions are captured and managed through the ventilation system. These systems are built to meet strict environmental standards. They will be continuously monitored to ensure they operate safely and effectively. Air quality monitoring is in place to ensure the system:
- operates within approved limits
- protects community health.
As part of the licence conditions, the operator must submit:
- annual reports to us assessing emissions
- system performance
- if further mitigation measures would be reasonably practicable.
The conditions of their licence (OLR02), including discharge to air limits, can be found on the Public register OL# - OL000300101.
Updated

